Graph Method-Based Model on the Simulation of Equipment Maintenance Process

Yi Le LIU;Yu CAO;Zong Chang XU

Systems Engineering - Theory & Practice ›› 2003, Vol. 23 ›› Issue (8) : 110-113.

PDF(127 KB)
PDF(127 KB)
Systems Engineering - Theory & Practice ›› 2003, Vol. 23 ›› Issue (8) : 110-113. DOI: 10.12011/1000-6788(2003)8-110
论文

Graph Method-Based Model on the Simulation of Equipment Maintenance Process

  • Yi Le LIU ,Yu CAO, Zong Chang XU
Author information +
History +

Abstract

the graph method-based model is used to illuminate the plan-graph, which is always used to plan the equipment maintenance progress. the impact of maintenance resource to this model is also reflect after being modified. And this model can also be

Key words

equipment maintenance / graph method-based model / simulation

Cite this article

Download Citations
Yi Le LIU , Yu CAO , Zong Chang XU. Graph Method-Based Model on the Simulation of Equipment Maintenance Process. Systems Engineering - Theory & Practice, 2003, 23(8): 110-113 https://doi.org/10.12011/1000-6788(2003)8-110
PDF(127 KB)

283

Accesses

0

Citation

Detail

Sections
Recommended

/