Goal Programming Applied to CIMS ERC Cell-job Planning System

Sun Jianhua;Xu Jun;Ren Yanpin

Systems Engineering - Theory & Practice ›› 1995, Vol. 15 ›› Issue (12) : 7-11.

PDF(347 KB)
PDF(347 KB)
Systems Engineering - Theory & Practice ›› 1995, Vol. 15 ›› Issue (12) : 7-11. DOI: 10.12011/1000-6788(1995)12-7
论文

Goal Programming Applied to CIMS ERC Cell-job Planning System

  • Sun Jianhua, Xu Jun, Ren Yanpin
Author information +
History +

Abstract

The task of cell-job planning system of CIMS-ERC is to seper- ate main production scheme ( MPS)into optimal daily production scheme. To meet the requirement of multi-objective,the method of goal program- ming is adopted.In this paper,a brief introduction of goal programming, system modelling and problem solving method is presented.To deal with discrete production planning,a gradually programming method is proposed.

Key words

cell-job planning system / CIMS-ERC / MPS / goal program- ming gradually programming

Cite this article

Download Citations
Sun Jianhua , Xu Jun , Ren Yanpin. Goal Programming Applied to CIMS ERC Cell-job Planning System. Systems Engineering - Theory & Practice, 1995, 15(12): 7-11 https://doi.org/10.12011/1000-6788(1995)12-7
PDF(347 KB)

350

Accesses

0

Citation

Detail

Sections
Recommended

/