Tree Planning Technique for Project Management──The simulation and optimization on WBS tree planning

Yang Jianguo

Systems Engineering - Theory & Practice ›› 1994, Vol. 14 ›› Issue (5) : 14-19.

PDF(1045 KB)
PDF(1045 KB)
Systems Engineering - Theory & Practice ›› 1994, Vol. 14 ›› Issue (5) : 14-19. DOI: 10.12011/1000-6788(1994)5-14
论文

Tree Planning Technique for Project Management──The simulation and optimization on WBS tree planning

  • Yang Jianguo
Author information +
History +

Abstract

Referring to Work Breakdown Structure (WBS),project management network techniques(CPM / PERT),Monte Carlo simulation approach,Direct Search algorithm and computer techniques,this paper gives forth a new kind of project management technique──project Management Tree Planning Technique,and introduces relevent new concepts and methods,such as Activity Tree model, Computing algorithm of times,simulation analysis for optimizing,the methods to choose the optimal plan.

Key words

Project Management / Tree Planning TPchnique / Network / Planning / Work Break-down Structure / Monte Carlo simulation

Cite this article

Download Citations
Yang Jianguo. Tree Planning Technique for Project Management──The simulation and optimization on WBS tree planning. Systems Engineering - Theory & Practice, 1994, 14(5): 14-19 https://doi.org/10.12011/1000-6788(1994)5-14
PDF(1045 KB)

411

Accesses

0

Citation

Detail

Sections
Recommended

/