多设备系统的生产批量、质量控制与预知维护联合优化

成国庆, 周炳海, 李玲

系统工程理论与实践 ›› 2019, Vol. 39 ›› Issue (8) : 2152-2161.

PDF(941 KB)
PDF(941 KB)
系统工程理论与实践 ›› 2019, Vol. 39 ›› Issue (8) : 2152-2161. DOI: 10.12011/1000-6788-2018-0104-10
论文

多设备系统的生产批量、质量控制与预知维护联合优化

    成国庆1,2, 周炳海1, 李玲3
作者信息 +

Joint optimization of production quantity, quality control and predictive maintenance for production systems with multiple machines

    CHENG Guoqing1,2, ZHOU Binghai1, LI Ling3
Author information +
文章历史 +

摘要

针对由多台设备通过串、并混联构成的多阶段生产系统,对其生产批量、质量控制以及预知维护进行了联合建模与优化.系统中的各台设备随时间逐渐发生劣化,可靠性及产品加工质量随之降低.在每个生产批量结束时,对各设备进行状态检测并评估其在下个生产期内的可靠性.预知维护同时以设备的可靠性、结构重要度以及产能比为决策依据,以合理分配维护资源.在每个阶段设置质检台以实时检测各设备加工产品的质量,并根据质量反馈信息,对次品率超过控制阈值的设备进行预防性更换以改善性能提高产品质量.以批量生产周期、质量控制阈值以及预知维护参数为三维联合决策变量,建立了有限时域内的平均费用率模型.基于蒙特卡罗仿真和响应曲面法设计了优化算法,实现了对模型的快速近似求解.最后通过一个实例演示了本模型,并对结果作了相关统计学分析.

Abstract

This paper considers an integrated optimization problem of production quantity, quality control and predictive maintenance for multi-stage production systems. Machines in the system deteriorate with usage and age, which result in deteriorations of reliability and product quality. At the end of production runs, the system is inspected to evaluate the condition of each machine and calculate the reliability during the next production run. The predictive maintenance decision-making is simultaneously based on the reliability, structure importance measure and capacity of machines to take good use of maintenance resources. After products are processed in each stage, quality check is conducted. Based on the quality information feedback, a preventive replacement is performed on the machine if the proportion of defectives produced by it reaches a given threshold. A mathematical model of average cost rate is developed to simultaneously determine the optimal values of production up time, quality control threshold and predictive maintenance parameter in a finite time horizon. By coupling Monte Carlo simulation and response surface methodology, a simulation-based optimization approach is devised to obtain a near optimal joint policy. Finally, an illustrative example is provided to demonstrate the proposed model and some statistical analysis are conducted.

关键词

多阶段生产系统 / 生产批量 / 质量控制 / 预知维护 / 仿真优化

Key words

multi-stage production system / production lot / quality control / predictive maintenance / simulation-based optimization

引用本文

导出引用
成国庆 , 周炳海 , 李玲. 多设备系统的生产批量、质量控制与预知维护联合优化. 系统工程理论与实践, 2019, 39(8): 2152-2161 https://doi.org/10.12011/1000-6788-2018-0104-10
CHENG Guoqing , ZHOU Binghai , LI Ling. Joint optimization of production quantity, quality control and predictive maintenance for production systems with multiple machines. Systems Engineering - Theory & Practice, 2019, 39(8): 2152-2161 https://doi.org/10.12011/1000-6788-2018-0104-10
中图分类号: TP391   

参考文献

[1] Bevilacqua M, Braglia M. The analytic hierarchy process applied to maintenance strategy selection[J]. Reliability Engineering & System Safety, 2000, 70(1):71-83.
[2] Groenvelt H, Pintelon L, Seidmann A. Production lot sizing with machine breakdowns[J]. Management Science, 1992, 38(1):104-123.
[3] Meller R D, Kim D S. The impact of preventive maintenance on system cost and buffer size[J]. European Journal of Operational Research, 1996, 95(3):577-591.
[4] Wee H M, Widyadana G A. A production model for deteriorating items with stochastic preventive maintenance time and rework process with FIFO rule[J]. Omega, 2013, 41(6):941-954.
[5] Liao G L. Joint production and maintenance strategy for economic production quantity model with imperfect production processes[J]. Journal of Intelligent Manufacturing, 2013, 24(6):1229-1240.
[6] Jafari L, Makis V. Optimal lot-sizing and maintenance policy for a partially observable production system[J]. Computers & Industrial Engineering, 2016, 93(1):88-98.
[7] Peng H, Houtum van G J. Joint optimization of condition-based maintenance and production lot-sizing[J]. European Journal of Operational Research, 2016, 253(1):94-107.
[8] Cheng G Q, Zhou B H, Qi F Q, et al. Modelling condition-based maintenance and replacement strategies for an imperfect production-inventory system[J]. Pro IMechE, Part B:Journal of Engineering Manufacture, 2016, 232(10):1858-1871. DOI:10.1177/0954405416675653.
[9] Chakraborty T, Giri B, Chaudhuri K. Production lot sizing with process deterioration and machine breakdown under inspection schedule[J]. Omega, 2009, 37(2):257-271.
[10] Tapiero C S. Continuous quality production and machine maintenance[J]. Naval Research Logistic, 1986, 33(3):489-499.
[11] Radhoui M, Rezg N, Chelbi A. Integrated maintenance and control policy based on quality control[J]. Computers & Industrial Engineering, 2010, 58(3):443-451.
[12] Bouslah B, Gharbi A, Pellerin R. Joint economic design of production, continuous sampling inspection and preventive maintenance of a deteriorating production system[J]. International Journal of Production Economics, 2016, 173(1):184-198.
[13] 周炳海, 刘子龙. 考虑质量损失的退化系统维护建模[J]. 浙江大学学报(工学版), 2016, 50(12):2270-2276. Zhou B H, Liu Z L. Maintenance modelling for deteriorating system considering quality loss[J]. Journal of Zhejiang University (Engineering Science), 2016, 50(12):2270-2276.
[14] 成国庆, 李玲, 唐应辉. 多态退化串联可修系统的最优维修更换策略[J]. 系统工程理论与实践, 2012, 32(5):1118-1123. Cheng G Q, Li L, Tang Y H. Optimal replacement policy for a deteriorating series repairable system with multi-state[J]. Systems Engineering-Theory & Practice, 2012, 32(5):1118-1123.
[15] Lu B, Zhou X J. Opportunistic preventive maintenance scheduling for serial-parallel multistage manufacturing systems with multiple streams of deterioration[J]. Reliability Engineering & System Safety, 2017, 168(1):116-127.
[16] Noortwijk J M. A survey of the application of gamma processes in maintenance[J]. Reliability Engineering & System Safety, 2009, 94(1):2-21.
[17] Birnbaum L W. On the importance of different elements in a multi-element system[M]. Multivariate Analysis, New York:Academic Press, 1969.
[18] 李玲, 成国庆, 柳炳祥. 基于Gamma过程的加速劣化系统模型及其最优视情维修策略[J]. 计算机集成制造系统, 2013, 19(11):2922-2927. Li L, Cheng G Q, Liu B X. Accelerated deteriorating system model based on Gamma process and its optimal condition-based maintenance policy[J]. Computer Integrated Manufacturing Systems, 2013, 19(11):2922-2927.

基金

国家自然科学基金(71661016,71471135);江西省自然科学基金(20171BAA208005,20171BAA218005)