中图分类号:
TH165.3
{{custom_clc.code}}
({{custom_clc.text}})
{{custom_sec.title}}
{{custom_sec.title}}
{{custom_sec.content}}
参考文献
[1] 金琳, 黄开敏, 周晓军. 租赁设备的多阶段预防性维护策略及优化[J]. 计算机集成制造系统, 2013, 19(12):2947-2953. Jin L, Huang K M, Zhou X J. Multi-period preventive maintenance policy and optimization for leased equipment[J]. Computer Integrated Manufacturing Systems, 2013, 19(12):2947-2953.
[2] Kobbacy K A H, Murthy D N P. Complex system maintenance handbook[M]. London:Springer Science & Business Media, 2008.
[3] 杨爱峰, 王文婷, 范世庆. 耐用设备租赁及预防性维修的联合优化策略[J]. 合肥工业大学学报(自然科学版), 2015, 38(4):552-557. Yang A F, Wang W T, Fan S Q. Joint optimization strategy for durable equipment leasing and preventive maintenance[J]. Journal of Hefei University of Technology (Natural Science Edition), 2015, 38(4):552-557.
[4] Sherwin D. A review of overall models for maintenance management[J]. Journal of Quality in Maintenance Engineering, 2000, 6(3):138-164.
[5] Jonge B, Teunter R, Tinga T. The influence of practical factors on the benefits of condition-based maintenance over time-based maintenance[J]. Reliability Engineering & System Safety, 2017, 158:21-30.
[6] Jaturonnatee J, Murthy D N P. Optimal preventive maintenance of leased equipment with corrective minimal repairs[J]. European Journal of Operational Research, 2006, 174(1):201-215.
[7] Yeh R H, Kao K C, Chang W L. Optimal preventive maintenance policy for leased equipment using failure rate reduction[J]. Computers & Industrial Engineering, 2009, 57(1):304-309.
[8] Schutz J, Rezg N. Maintenance strategy for leased equipment[J]. Computers & Industrial Engineering, 2013, 66(3):593-600.
[9] Chang W L, Lo H C. Joint determination of lease period and preventive maintenance policy for leased equipment with residual value[J]. Computers & Industrial Engineering, 2011, 61(3):489-496.
[10] 李林, 金琳, 周晓军. 基于冲击建模的租赁设备预防维护策略[J]. 计算机集成制造系统, 2013, 19(1):114-118. Li L, Jin L, Zhou X J. Preventive maintenance strategy based on shock modeling for leasing equipment[J]. Computer Integrated Manufacturing Systems, 2013, 19(1):114-118.
[11] 金琳, 王燕, 周晓军. 基于虚拟年龄的租赁设备预防性维护策略研究[J]. 工业工程与管理, 2013, 18(6):68-72. Jin L, Wang Y, Zhou X J. Research on virtual age based preventive maintenance policy for leased equipment[J]. Industrial Engineering and Management, 2013, 18(6):68-72.
[12] Yeh R H, Chang W L, Lo H C. Optimal threshold values of age and two-phase maintenance policy for leased equipments using age reduction method[J]. Annals of Operations Research, 2010, 181(1):171-183.
[13] Zhou X, Wu C, Li Y, et al. A preventive maintenance model for leased equipment subject to internal degradation and external shock damage[J]. Reliability Engineering & System Safety, 2016, 154:1-7.
[14] 仲建兰, 马义中, 刘利平. 两阶段串联可修系统的统计过程控制与视情维修整合研究[J]. 系统工程理论与实践, 2014, 34(9):2339-2349. Zhong J L, Ma Y Z, Liu L P. Integration SPC and condition-based maintenance for two-stage series repairable systems[J]. Systems Engineering-Theory & Practice, 2014, 34(9):2339-2349.
[15] 杨森. 基于视情维修的电子装备PHM体系结构分析[J]. 计算机科学, 2017, 44(9):17-22. Yang S. Analysis of equipment PHM architecture based on condition maintenance[J]. Computer Science, 2017, 44(9):17-22.
[16] Keizer M, Flapper S, Teunter R. Condition-based maintenance policies for systems with multiple dependent components:A review[J]. European Journal of Operational Research, 2017, 261(2):405-420.
[17] Liu B, Wu S, Xie M, et al. A condition-based maintenance policy for degrading systems with age-and state-dependent operating cost[J]. European Journal of Operational Research, 2017, 263(3):879-887.
[18] 王凌. 维修决策模型和方法的理论与应用研究[D]. 杭州:浙江大学, 2007. Wang L. Models and methods for maintenance decisions:Theory and applications[D]. Hangzhou:Zhejiang University, 2007.
[19] Tian Z, Jin T, Wu B, et al. Condition based maintenance optimization for wind power generation systems under continuous monitoring[J]. Renewable Energy, 2011, 36(5):1502-1509.
[20] Marseguerra M, Zio E, Podofillini L. Condition-based maintenance optimization by means of genetic algorithms and Monte Carlo simulation[J]. Reliability Engineering & System Safety, 2002, 77(2):151-165.
[21] Alaswad S, Xiang Y. A review on condition-based maintenance optimization models for stochastically deteriorating system[J]. Reliability Engineering & System Safety, 2017, 157:54-63.
[22] Wang L, Chu J, Mao W. A condition-based order-replacement policy for a single-unit system[J]. Applied Mathematical Modelling, 2008, 32(11):2274-2289.
[23] Zhang X, Zeng J. Joint optimization of condition-based repair-by-replacement and spare parts provisioning policy with random maintenance time and lead time[C]//Proceedings of the 22nd International Conference on Industrial Engineering and Engineering Management 2015, Atlantis Press, Paris, 2016:347-357.
[24] Tang D, Makis V, Jafari L, et al. Optimal maintenance policy and residual life estimation for a slowly degrading system subject to condition monitoring[J]. Reliability Engineering & System Safety, 2015, 134:198-207.
[25] Grall A, Bérenguer C, Dieulle L. A condition-based maintenance policy for stochastically deteriorating systems[J]. Reliability Engineering & System Safety, 2002, 76(2):167-180.
[26] Dieulle L, Bérenguer C, Grall A, et al. Sequential condition-based maintenance scheduling for a deteriorating system[J]. European Journal of Operational Research, 2003, 150(2):451-461.
[27] 张晓红, 曾建潮. 基于状态空间分割的两部件系统机会维修优化[J]. 系统工程理论与实践, 2015, 35(6):1547-1560. Zhang X H, Zeng J C. State space partition based optimization of the opportunistic preventive maintenance of two-unit systems[J]. Systems Engineering-Theory & Practice, 2015, 35(6):1547-1560.
{{custom_fnGroup.title_cn}}
脚注
{{custom_fn.content}}
基金
国家自然科学基金(71701140,61573250);山西省青年科技研究基金(201601D021082);山西省科技攻关计划项目(2015031004);山西省回国留学人员科研资助项目(2016-091);太原科技大学校博士启动基金(20152021);太原科技大学校青年科技研究基金(20153015)
{{custom_fund}}