随机需求下基于库存责任期的装配系统准时供货模型

关旭, 马士华, 应丹丰

系统工程理论与实践 ›› 2013, Vol. 33 ›› Issue (9) : 2220-2228.

PDF(671 KB)
PDF(671 KB)
系统工程理论与实践 ›› 2013, Vol. 33 ›› Issue (9) : 2220-2228. DOI: 10.12011/1000-6788(2013)9-2220
研究论文

随机需求下基于库存责任期的装配系统准时供货模型

    关旭1, 马士华2, 应丹丰2
作者信息 +

On time delivery model with vendor inventory liability period in assembly system with random demand time

    GUAN Xu1, MA Shi-hua2, YING Dan-feng2
Author information +
文章历史 +

摘要

以装配系统为研究对象, 考虑在VMI模式下, 当制造商采取设定库存责任期以抵御市场需求时间不确定的风险时, 供应商的最优供货时间决策和制造商最优的库存责任期设置. 文章分别建立了单供应商对单制造商和多供应商对单制造商的主从博弈准时供货模型, 通过数学证明和遍历算法找到了供应链双方在不同模式下的最优选择. 研究结果证明制造商并 不应该选择过长的库存责任期, 而供应商之间的不同步供货会对供应链整体造成巨大损失. 并且通过对比集中与分散决策下的供应链绩效, 给出实现系统协同的必要条件. 最后通过算例分析进一步证明相关结论.

Abstract

Under VMI policy, manufacturer can use vendor inventory liability period to mitigate the risk caused by an uncertain demand time. This paper investigates the suppliers' optimal delivery times and manufacturer's vendor inventory liability period respectively in a decentralized assembly system setting. Building a basic model with a single supplier and an extend model consisted by multi-suppliers, the optimal choices for both parties have been figured out by both mathematical justification and sequential procedure. The results show that it is not wise for manufacturer to set a too long liability period, and the unsynchronized deliveries among suppliers can heavily hurt supply chain performance. Additionally, we provide the coordination mechanism and numerical example.

关键词

装配系统 / 库存责任期 / 准时供货 / 供应链协同

Key words

assembly system / inventory liability period / on-time delivery / coordination

引用本文

导出引用
关旭 , 马士华 , 应丹丰. 随机需求下基于库存责任期的装配系统准时供货模型. 系统工程理论与实践, 2013, 33(9): 2220-2228 https://doi.org/10.12011/1000-6788(2013)9-2220
GUAN Xu , MA Shi-hua , YING Dan-feng. On time delivery model with vendor inventory liability period in assembly system with random demand time. Systems Engineering - Theory & Practice, 2013, 33(9): 2220-2228 https://doi.org/10.12011/1000-6788(2013)9-2220
中图分类号: F224   

参考文献

[1] Waller M, Johnson M E, Davis T. Vendor-managed inventory in the retail supply chain[J]. Journal of Business Logistics, 1999, 20(1): 183-203.

[2] Barnes E, Dai J, Deng S J, et al. On the strategy of supply hubs for cost reduction and responsiveness[C]//White Paper on Electronics Supply Chain, Georgia Institute of Technology and National University of Singapore, 2000.

[3] Gerchak Y, Wang Y, Yano C A. Lot sizing in assembly systems with random component yields[J]. IIE Transactions, 1994, 26(2): 19-24.

[4] Güler M G, Bilgic T. On coordinating an assembly system under random yield and random demand[J]. European Journal of Operational Research, 2009, 196(1): 342-350.

[5] Xiao Y B, Chen J, Lee C Y. Optimal decisions for assemble-to-order systems with uncertain assembly capacity[J]. International Journal of Production Economics, 2010, 123: 155-165.

[6] Yano C A. Stochastic lead times in two-level assembly systems[J]. IIE Transactions, 1987, 19: 371-378.

[7] Tang O, Grubbstrom R W. The detailed coordination problem in a two-level assembly system with stochastic lead times[J]. International Journal of Production Economics, 2003, 81-82: 415-429.

[8] 浦徐进,石琴,凌六一.多供应商准时制惩罚机制与激励机制研究[J].计算机集成制造系统, 2006, 12(11): 1876-1880. Pu X J, Shi Q, Ling L Y. Penalty policy and incentive policy of JIT for multi-supplier[J]. Computer Integrated Manufacturing Systems, 2006, 12(11): 1876-1880.

[9] Iyer A V, Bergen M E. Quick response in manufacturer-retailer channels[J]. Management Science, 1997, 43(4): 559-570.

[10] Grout J R. A model of incentive contracts for just-in-time delivery[J]. European Journal of Operational Research, 1996, 96: 139-147.

[11] Grout J R. Influencing a supplier using delivery windows: Its effect on the variance of flow time and on-time delivery[J]. Decision Sciences, 1998, 29(3): 747-764.

[12] Guirida A L, Nagi R. Cost characterizations of supply chain delivery performance[J]. International Journal of Production Economics, 2006, 102: 22-36.

[13] 杨文胜, 李莉.基于Stackelberg模型的准时交货激励契约分析[J]. 系统工程理论与实践, 2006, 26(12): 17-23. Yang W S, Li L. Decision analysis of just in time delivery incentive contract based on Stackelberg model[J]. Systems Engineering-Theory & Practice, 2006, 26(12): 17-23.

[14] Cetinkaya S, Lee C Y. Stock replenishment and shipment scheduling for vendor-managed inventory systems[J]. Management Science, 2007, 46(2): 217-232.

[15] Disney S M, Towill D R. The effect of vendor managed inventory (VMI) dynamics on the bull whip effect in supply chains[J]. International Journal of Production Economics, 2003, 85: 199-215.

[16] Rungtusanatham M, Rabinovich E, Ashenbaum B, et al. Vendor-owned inventory arrangements in retail: An agency theory perspective[J]. Journal of Business Logistics, 2007, 28(1): 111-135.

[17] Lee C, Chu W. Who should control inventory in a supply chain?[J]. European Journal of Operational Research, 2005, 164: 158-172.

[18] Dong X, Xu K. A supply chain model of vendor managed inventory[J]. Transportation Research Part E, 2002, 38: 75-95.

[19] Cachon G P. The allocation of inventory risk in a supply chain: Push, pull, and advance-purchase discount contracts[J]. Management Science, 2004, 50(2): 222-238.