多种资源受限多项目排序问题的两层决策方法

谈烨;仲伟俊;徐南荣

系统工程理论与实践 ›› 2001, Vol. 21 ›› Issue (2) : 1-5.

PDF(180 KB)
PDF(180 KB)
系统工程理论与实践 ›› 2001, Vol. 21 ›› Issue (2) : 1-5. DOI: 10.12011/1000-6788(2001)2-1
论文

多种资源受限多项目排序问题的两层决策方法

    谈烨(1),仲伟俊(2),徐南荣(2)
作者信息 +

Bi-level Decision Method for Multi-Resource Constrained Multi-project Scheduling

    Ye TAN(1),Wei Juan ZHONG(2),Nan Rong XU(2)
Author information +
文章历史 +

摘要

分析了多种资源受限多项目排序问题的性质和特点 ,提出用两层决策方法建立这类问题的数学模型 .将基于直接搜索法的随机全局优化方法用于求解该问题的全局最优解 ,给出了具体的算法步骤 .计算示例表明 ,本文建立的模型和给出的算法能有效地求解多种资源受限多项目排序问题.

Abstract

In this paper, the characteristics of multi-resource constrained multi-project scheduling problem is analyzed. A bi-level decision method is used to construct the mathematical model of this problem. A stochastic global optimization method based on direct search is introduced to solve the global optimal solution of the problem, and the process is also discussed in detail. The results of mathematical examples indicate that the mathematical model and the optimization method proposed in this paper can solve...

关键词

项目排序 / 两层决策 / 随机全局优化方法

Key words

multi\|project scheduling / bi-level decision making / stochastic global optimization method /

引用本文

导出引用
谈烨 , 仲伟俊 , 徐南荣. 多种资源受限多项目排序问题的两层决策方法. 系统工程理论与实践, 2001, 21(2): 1-5 https://doi.org/10.12011/1000-6788(2001)2-1
Ye TAN , Wei Juan ZHONG , Nan Rong XU. Bi-level Decision Method for Multi-Resource Constrained Multi-project Scheduling. Systems Engineering - Theory & Practice, 2001, 21(2): 1-5 https://doi.org/10.12011/1000-6788(2001)2-1
PDF(180 KB)

323

Accesses

0

Citation

Detail

段落导航
相关文章

/