不确定性网络直接优化规划模型建立(Ⅰ)

李文华;谭燕秋

系统工程理论与实践 ›› 2000, Vol. 20 ›› Issue (12) : 97-101.

PDF(169 KB)
PDF(169 KB)
系统工程理论与实践 ›› 2000, Vol. 20 ›› Issue (12) : 97-101. DOI: 10.12011/1000-6788(2000)12-97
论文

不确定性网络直接优化规划模型建立(Ⅰ)

    李文华,谭燕秋
作者信息 +

The Foundation of Direct Optimizing Programming Model in Uncertain Network (Ⅰ)

    Wen Hua LI,Yan Qiu TAN
Author information +
文章历史 +

摘要

分析了不确定性网络直接优化的现状、优化的困难、目前存在的问题 ;给出了不确定网络直接优化的原则以及一般方法 ,同时建立了 PERT网络工期压缩、最优工期的线性规划模型、灰色线性规划模型 ,改进了传统的资源优化法.

Abstract

After analyzing the actuality of uncertain network's direct optimizing, difficulty of optimizing and the existing question at present, the principle and common method of uncertain network's direct optimizing was put forward, at the same time PERT network time limit for a project compression, linear programming model of the optimal time limit for a project and gray linear programming model was established, the traditional resource optimizing method was improved.

关键词

不确定性网络 / 直接优化 / 灰色线性规划

Key words

uncertain network / optimizing / gray linear programming

引用本文

导出引用
李文华 , 谭燕秋. 不确定性网络直接优化规划模型建立(Ⅰ). 系统工程理论与实践, 2000, 20(12): 97-101 https://doi.org/10.12011/1000-6788(2000)12-97
Wen Hua LI , Yan Qiu TAN. The Foundation of Direct Optimizing Programming Model in Uncertain Network (Ⅰ). Systems Engineering - Theory & Practice, 2000, 20(12): 97-101 https://doi.org/10.12011/1000-6788(2000)12-97
PDF(169 KB)

Accesses

Citation

Detail

段落导航
相关文章

/