In large scale civil construction, it is difficulty to estimate the project cost.This paper gives the fuzzy evaluation method of characteristic factors of project,establishes a cost estimate model based on information of real engineering materials and design documents of estimated project. A case study showes that the model is feasible, and estimate results are reliable.
Hu Zhigen . , {{custom_author.name_en}}.
An Estimate Model of Project Cost Based on Fuzzy Forecast. Systems Engineering - Theory & Practice, 1997, 17(2): 51-56 https://doi.org/10.12011/1000-6788(1997)2-51