大规模产品生产作业计划作业事项号的自动生成

王克海

系统工程理论与实践 ›› 1994, Vol. 14 ›› Issue (8) : 51-55.

PDF(366 KB)
PDF(366 KB)
系统工程理论与实践 ›› 1994, Vol. 14 ›› Issue (8) : 51-55. DOI: 10.12011/1000-6788(1994)8-51
论文

大规模产品生产作业计划作业事项号的自动生成

    王克海
作者信息 +

The Automatic Generation of the Event Number for the Large…Scaled Producting Task Scheduling

    Wang Kehai
Author information +
文章历史 +

Abstract

None Practical technique that aids in scheduling largescaled producting task has been reported. The main reason is that there is lacking of concise,ping pointing arithmetic model that meets the needs of the real world practice, In addition, up to thousands tasks cannot be ordered automatically to the event number in the network diagram via the interior logic relationship and remained unchanged in the rnaking and revising the whole plan. It is the very topic that will solve the problem, TLZ model and the implementation, in this paper, Practice in more than two years has proven the correctness of the model and the arithmetic as well as the efficiency of the program. In January this year,TLZ was evaluated by the provincial experts who consider that it is valuable and widely used in the scholarly work.

关键词

生产作业计划 / 项号 / 逻辑关系 / 层次结构 / 结束事项 / 产品生产 / 网络图 / 生产计划 / 云南省 / 计算技术研究所

引用本文

导出引用
王克海. 大规模产品生产作业计划作业事项号的自动生成. 系统工程理论与实践, 1994, 14(8): 51-55 https://doi.org/10.12011/1000-6788(1994)8-51
Wang Kehai . The Automatic Generation of the Event Number for the Large…Scaled Producting Task Scheduling. Systems Engineering - Theory & Practice, 1994, 14(8): 51-55 https://doi.org/10.12011/1000-6788(1994)8-51
中图分类号: F273   
PDF(366 KB)

344

Accesses

0

Citation

Detail

段落导航
相关文章

/